html Electromagnet Platform · Crusher · CGK Projects
Back to projects Electromagnet Platform · Case study

A platform tested with 100 tonnes on top

Application
Crusher electromagnet
Year
2025
Lift
6 hydraulic cylinders
Load test
100 t
From 3D model to load test

One platform, three stages: model, simulation and a 100 t test.

Drag the handles to walk through the three stages: the 3D model of the platform, the von Mises FEM stress simulation with 100 t applied — mesh and load arrows — and the real test, certified with 100 tonnes of counterweights. Same framing in all three.

Electromagnet platform during the real load test with 100 tonnes of counterweights in the CGK workshop
Von Mises FEM stress simulation of the platform with a 100-tonne applied load
3D CAD model of the electromagnet platform
01 · 3D model 02 · Simulation · 100 t 03 · Reality Drag ←→
Description

A crusher's electromagnet has to sit exactly where it belongs. The platform that holds and positions it was designed, built and certified by us, end to end.

We started by surveying the electromagnet and its mounting environment. The key requirement: the platform had to rise around 300 mm to match the electromagnet's position at the mine, and that lift is achieved with six hydraulic cylinders operating simultaneously. That demands a rigid, level structure with no weak points, which we verified with von Mises FEM structural analysis before fabricating — the second stage of the slider shows that result, with the applied load arrows.

Certification was done with a real 100-tonne load test: a combination of yellow counterweights and one black counterweight adding up to 100 t. Engineering, fabrication and certification all came from under the same roof, with full support throughout the project.

Gallery
Let's talk

Does your equipment need a structure that is genuinely certified?

We survey, design, build and test with a real load before handing over. Tell us what has to be supported.